Print VersionMaintenance Eligibility Notes
|
|
One of the main goals in reviewing development proposals for the Maintenance Eligibility Program is implementing District master plans. Consider for example the Brantner Gulch basin in the City of Thornton. In 1998, the District, Thornton and Adams County completed the Northern Tributary Watersheds Major Drainageway Planning Study. This year development pressure affected almost the entire drainage basin. The area in question is located between 124th and 140th Avenues, and Holly Street to Riverdale Road. Some 14-quarter section development proposals are in process or are under construction. Many of these proposals have different development groups and/or design engineers. All of the public major drainageway infrastructure will be constructed by private groups and in tandem with on-site development.
Major drainageway components include grade control and drop structures, flood attenuation and water quality ponds, and roadway crossings. In some cases the development applicant has requested revisions to the District's master plan. The overarching drainageway strategy is floodplain preservation coupled with stream stabilization. All of these tributaries to Brantner Gulch are stable in their pre-development condition. In stark contrast is Brantner Gulch east (downstream) of Holly Street. This reach has been heavily impacted by adjacent development that stayed out of the floodplain, but failed to install adequate stream controls. Fortunately, one of the current development proposals will stabilize this stream reach and mitigate past damage. The development community has generally been very cooperative through this effort. Public review agencies have also worked together in order to achieve a positive and coordinated outcome. Only through a public/private sector partnership, based on a comprehensive master plan and using proven design principals can "historic" conditions be preserved. The benefit is reduced public burden in terms of maintenance costs, increased community assets in terms of open space, trails, recreation, and habitat preservation, and improved product marketability for the housing projects.
|
The District issued updated Volumes 1 & 2 of the Urban Storm Drainage Criteria Manual (USDCM) in June of 2001. Trash rack design criteria was further updated through revisions posted on the District's web site in July, 2001. This update addressed the need for trash racks at detention pond outlet structures, storm sewer outfalls and roadway culverts. Several plan submittals this past year demonstrated some confusion relative to trash rack design. The following discussion is a summary of District design guidelines taken from Section 8.0 of the Culvert Chapter and Section 4.8 of the Storage Chapter, Volume 2, USDCM, and the Maintenance Eligibility Guidelines. An update to Volume 3 of the USDCM was issued and posted on our web site in June, 2002. Please refer to that document for appropriate design guidance for trash racks located at water quality outlet works.
An integral part of the maintenance eligibility process is construction oversight. Construction activity has increased this year over past years. At any given time, we typically have 120 to 150 projects approved for construction spread out over 1600 square miles in many different local jurisdictions. We heavily depend on networking and partnerships developed with local governments and various engineering consultants over the years to adequately cover construction oversight. In some cases, local government inspection staff have conducted construction observations on the District's behalf. Field reports and/or digital photos are typically provided to us through e-mail. We also rely upon local inspection staff, engineering consultants and in some instances, contractors to keep us apprised of construction progress and the need for District construction site visits. During 2002, District staff completed 150 construction site visits. Over 75 current projects were completed and recommended for construction acceptance during the preceding 12 months. Another 20 previously approved projects were re-inspected for adequate vegetative cover and received final approval.
[ Home ]